Energy Infrastructure and Economic Development in Garrett County

Garrett County has supplied energy to the region for generations. Coal helped fuel industry, the Deep Creek hydroelectric project created a lake that transformed the county’s economy, and our ridgelines now carry wind turbines and solar panels. As demand for electricity grows, we face another opportunity to decide how energy development should contribute to the place we call home.

At the end of a November 2025 presentation on the county’s energy history, I asked the audience which of several options they would oppose least. Of 27 responses, ten selected a small modular nuclear reactor, the largest share of any option. Six chose renewables with backup. It was an informal audience poll, not a countywide survey, but it suggested an opening for a discussion that goes beyond familiar positions for or against particular technologies. [1]

The pressure for that discussion is growing. A Berkeley Lab report published in June 2026 estimates that data centers could consume 11.8 percent of U.S. electricity by 2030, with scenarios ranging from 9.5 to 15.3 percent. Those are projections, not guaranteed demand. They nevertheless illustrate why utilities, developers and communities are considering new generating plants and transmission infrastructure. [2]

For Garrett County, the economic question is how much lasting value stays here. Construction brings work for electricians, equipment operators and contractors, along with customers for hotels and restaurants. Permanent operations sustain a different kind of benefit. Land leases and tax payments can matter even when a facility employs relatively few people. Our approved FY2027 budget includes $4.61 million on the revenue line labeled Personal Property (Windmills), showing the scale of the fiscal stakes. That is budgeted revenue, not a statement of collections already received. [3]

Solar and wind illustrate these differences. CPV says the initial 160-megawatt Backbone Solar project entered operation in December 2025 and involved more than 200 construction jobs. A completed solar farm requires a much smaller operating workforce. Wind supports turbine maintenance and lease payments but changes the appearance of ridgelines over a broad area. Both technologies use little water during operation and produce electricity without combustion. Their output varies with the weather and, for solar, the time of day. [4, 5, 6]

A small modular reactor, or SMR, offers a different combination: concentrated land use, power available around the clock subject to outages, and skilled operating jobs. DOE’s benchmark of roughly 237 permanent jobs per gigawatt would translate to about 71 for a 300-megawatt facility, although actual staffing could differ substantially. We should examine that possibility without assuming that a compact reactor is a ready-made local project. Financing, licensing, cooling, spent fuel management and grid access all require answers. The footprint and water demand also depend on the reactor design. [5, 7]

A natural gas combined-cycle plant combines a gas turbine with a steam turbine that recovers its exhaust heat. It can deliver substantial output from a compact site, with relatively few permanent workers. Its practical requirements include dependable pipeline capacity, emissions controls and a suitable cooling system. Existing gas infrastructure could be relevant, but its presence alone does not establish that a new plant can obtain the fuel service it needs. Coal would support plant operations and potentially fuel supply jobs, while adding ash management, emissions and fuel transportation burdens. Any proposal would have to demonstrate that it can compete financially and meet applicable permitting requirements. [7]

Biomass deserves a separate look because fuel purchases might support local forestry, wood processing and trucking. A Virginia example, the approximately 50-megawatt Halifax County plant, reported 26 permanent positions at its opening. But a forested county does not automatically have an affordable, sustainable supply of unused wood. We would need to establish the available residues, competing uses, delivered costs and traffic implications. A plant supplying useful heat to a nearby business might offer more value than one producing electricity alone. Burning wood also creates emissions; renewable fuel does not mean zero environmental impact. [8, 9]

Water could determine whether any thermal plant is suitable. Using older national cooling-tower benchmarks, a 100-megawatt plant operating at an illustrative 80 percent capacity factor would consume about 380,000 gallons per day if it were gas combined cycle, compared with roughly 1.3 million for conventional nuclear generation. The nuclear figure is a proxy for a water-cooled SMR, not an SMR specification. Dry cooling can greatly reduce consumption, but changes costs and performance. A proposal needs a drought-season water balance before anyone assumes a nearby river or lake can supply it. [6]

Energy development also has to fit the economy we already have. Scenic views, clean water and outdoor recreation help support local businesses and attract residents. Siting on previously disturbed land deserves serious consideration, but even a reclaimed site needs careful review. New transmission deserves the same scrutiny: what reliability or development benefit does the county receive, and what land and views must it commit? A nearby power plant also does not automatically mean lower local electric bills, because wholesale markets and retail supply arrangements determine how electricity is purchased and priced. [10]

We should develop a county energy strategy that identifies plausible sites and makes developers show their local contribution. That means permanent payroll, opportunities for local suppliers, tax revenue over the project’s life, and the costs of roads, public services and eventual closure. Garrett College and local employers could help residents prepare for the work that credible projects would create. We can be open to new energy investment while requiring a clear account of what Garrett County gains in return.

Power Plant Comparison

These are screening benchmarks and examples, not estimates for a proposed Garrett County project. Capacity is electrical megawatts, with solar stated on an AC basis. A megawatt is 1,000 kilowatts; divide acres per MW by 1,000 to obtain acres per kW.

TechnologyPermanent jobs per 100 MWSite land acres per MWWater consumed gal per MWh
Solar PV3.6 [5]6.7 reference site [7]26 median; 0-33 range [6]
Land-based wind8 [5]0.74 permanent disturbance; about 85 total project area [11]0 median; 0-1 range [6]
Water-cooled SMR23.7 projected [5]0.073 reference site [7]672 proxy; 581-845 range [6]
Coal10.7 [5]0.62 reference site [7]687 generic median; 480-1,100 range [6]
Natural gas combined cycle3 [5]0.048 reference site [7]198 median; 130-300 range [6]
Woody biomass steam plant52 equivalent from one example [8, 9]2.0 example site [9]553 median; 480-965 range [6]

Jobs: DOE’s 2023/2024 Liftoff comparison gives 36 solar, 80 wind, 237 SMR, 107 coal and 30 natural gas jobs per GW. Values above divide these by ten. The gas category is not an NGCC-specific staffing study. The SMR value is a projection. These figures describe permanent onsite positions, not total sector employment, construction workers or fuel supply jobs. Smaller plants need minimum crews, so linear scaling can understate their staffing. Biomass is a separate historical project example: 26 positions / 49.9 MW x 100 = 52.1; it is not a comparable national average.

Land: EIA’s 2024 reference designs assume 1,000 acres / 150 MW solar, 35 acres / 480 MW SMR, 400 acres / 650 MW coal and 30 acres / 627 MW NGCC. The biomass example occupies 100 acres / 49.9 MW. These are site figures, not complete lifecycle land use: mining, fuel production, fuel collection areas, offsite pipelines and transmission corridors are excluded. SMR land requirements are design assumptions, not observed U.S. operating averages; additional buffers and construction land may be needed.

Wind: NREL’s 2009 study reports 0.3 hectares/MW of permanent direct disturbance and 34.5 hectares/MW within the broader project area, converted here at 2.471 acres/hectare. Temporary construction disturbance is additional. Much of the land between turbines can remain in other uses. These historical national averages are not Garrett County ridge-siting estimates.

Water: NREL’s 2011 literature review supplies operational medians and reported study ranges. Thermal rows assume recirculating wet cooling towers, without carbon capture. Nuclear is a conventional-plant proxy for a light-water SMR. Coal uses the generic category; the review’s supercritical-coal median is lower, 493 gal/MWh. Water consumption is water evaporated or otherwise removed from the immediate water environment; withdrawals are higher. Fuel production and manufacturing water are excluded. Design-specific dry or hybrid cooling would change the comparison substantially.

Visible Impacts and Local Economic Opportunities

The assessments below are qualitative judgments based on facility form and operating requirements. Visual impact has no universal numeric score; terrain, viewing distance, screening and the sensitivity of nearby homes or recreation areas determine its local significance.

TechnologyVisual and other local impactsPotential local benefit and decisive constraint
Solar PVBroad, low arrays; fencing, grading and possible clearing. Inverter noise is localized.Construction, leases and tax base; modest ongoing crews. Examine disturbed sites, habitat, drainage and actual local output.
WindTall moving structures, lighting, shadow flicker and sound; ridge roads and habitat effects.Leases, taxes and technicians. Examine wind resource, setbacks, wildlife and views from valued locations.
SMRConcentrated industrial buildings, security fencing and cooling equipment; wet cooling can produce visible vapor.Skilled operators, security and maintenance. Establish financing, licensing, cooling, waste management and workforce requirements.
CoalIndustrial buildings, stack, coal handling, ash facilities, cooling vapor and fuel traffic.Operating and fuel supply work if contracted locally. Establish market viability, emissions compliance, water and ash arrangements.
NGCCTurbine buildings, stacks, cooling equipment and substation; machinery noise and possible vapor.Construction, operating work and taxes. Establish firm gas delivery, grid access, cooling and emissions requirements.
BiomassBoiler and stack, wood storage, cooling equipment and frequent delivery trucks; dust, noise and ash.Operating work plus possible local fuel purchases. Establish sustainable residue supply, delivered costs and a useful heat customer.

How to compare construction employment

Ask each developer for average and peak onsite employment, construction duration, total full-time-equivalent job-years, expected local hiring, and purchases from county businesses. One worker employed for two years represents two job-years; a claim of 500 workers involved over a project is not 500 permanent jobs. Factory manufacturing and indirect or induced employment should be reported separately.

Backbone Solar’s developer reports more than 200 jobs during 14-18 months of construction. NOVEC reported more than 500 construction workers involved in its Halifax biomass project. Neither statement defines a consistent FTE job-year measure, so they should not be used as a technology ranking. A credible six-way numerical construction comparison needs defined project sizes and a common employment model. [4, 8]

Capacity and annual electricity are different

A 100 MW solar plant is not equivalent to 100 MW of around-the-clock generation. With illustrative capacity factors of 20% for solar, 35% for wind and 90% for nuclear, annual production would be 175,200, 306,600 and 788,400 MWh respectively. These are calculation assumptions, not measured Garrett County performance. Compare acres and jobs per annual MWh as well as per MW, and assess hourly availability separately. Batteries add costs, land and equipment; their power rating and hours of storage must be specified.

Sources and Calculation Notes

[1] History of Energy Resources of Garrett County with poll

[2] Lawrence Berkeley National Laboratory 2025 Update published June 2026

[3] Garrett County approved Fiscal Year 2027 Budget

https://www.garrettcountymd.gov/sites/default/files/2026-08/FY2027Budget.pdf


Printed page 4, PDF page 6: FY2027 Personal Property (Windmills) budget line is $4,606,569. The detailed schedule uses the broader Personal Property label. County Finance should confirm the contributing assets before attributing the whole amount exclusively to wind turbines.

[4] CPV Backbone Solar project overview


Developer-reported 160 MWac initial phase, December 2025 operations, more than 200 construction jobs and 14-18 month construction period.

[5] DOE Advanced Nuclear economic and employment comparison


2023 article and Figure 9. The 2024 Advanced Nuclear Liftoff report reproduces the 237 / 107 / 30 / 80 / 36 jobs-per-GW benchmarks, with updated wage figures; a report copy is available at https://olis.oregonlegislature.gov/liz/2025R1/Downloads/PublicTestimonyDocument/138410

Wages are omitted here because source years differ and they are not current local offers.

[6] Macknick and colleagues NREL operational water review 2011

https://www.nlr.gov/docs/fy11osti/50900.pdf


Tables 1-3, printed pages 12-14. Historical literature benchmarks, not contemporary site-specific design requirements. At 100 MW and 80% utilization: 100 x 24 x 0.8 x 198 = 380,160 gal/day for NGCC; the nuclear proxy is 1,290,240 gal/day using 672 gal/MWh.

[7] EIA Capital Cost and Performance Characteristics January 2024

https://www.eia.gov/analysis/studies/powerplants/capitalcost/pdf/capital_cost_AEO2025.pdf


Cases 1, 6, 10 and 16 provide the coal, NGCC, SMR and solar reference configurations. Site acreage ratios are author calculations. The SMR case represents a generic six-module water-cooled design; it is not a named project proposal.

[8] NOVEC Halifax biomass plant opening November 2013

https://www.novec.com/About_NOVEC/News_Release/nr111813.cfm


49.9 MW, 26 full-time operating positions and more than 500 construction workers involved. The release describes reclaimed wastewater cooling. Environmental promotional claims are not adopted here.

[9] Southside Planning District Commission South Boston Energy Project


49.9 MW on a 100-acre brownfield site. EIA describes industrial biomass cogeneration at https://www.eia.gov/energyexplained/biomass/

[10] PJM Learning Center Market for Electricity

https://learn.pjm.com/electricity-basics/market-for-electricity.aspx


Explains wholesale and retail electricity markets. The conclusion that hosting a generator does not guarantee lower local bills follows from these market arrangements.

[11] NREL Land Use Requirements of Modern Wind Power Plants 2009

https://www.nlr.gov/docs/fy09osti/45834.pdf


Table 1 and section 4.2 report permanent disturbance and overall project area. Acres conversion and rounded values are author calculations.